I ordered a Bambu Lab P2S in early November, on an early Black Friday deal. Two and a half weeks later it has printed parts for my server rack, my desk, the lights on my walls and a friend's family, and I have a list of projects that keeps getting longer. This is a post about what that has been like.
Why I bought it
I run a homelab in a 10" rack, and 10" rack accessories are expensive for what they are. A shelf, a blanking panel or a bracket for one odd device can cost more than the device it holds, and often the exact part doesn't exist at all. I kept finding myself thinking "I could make that". The P2S is me finally acting on it.
I bought the Combo with the AMS 2 Pro, mostly for its filament drying. I print mostly in PETG, and PETG absorbs moisture from the air and prints badly once it has. Being able to dry filament in the same unit that feeds the printer was worth the extra cost to me. I've also connected the printer to Home Assistant over the local network, so I can start and stop a drying cycle from my phone without the cloud.
What I've made so far
This is everything that has come off the printer in under three weeks. Almost all of it is my own design, modelled in code (OpenSCAD and CadQuery) so I can change a measurement and regenerate the part.
| Project | What it solves | Where it stands |
|---|---|---|
| 2U kiosk display panel | Holds a long 8.8" status display in the rack, with a cradle for its driver board | Installed and working |
| PSU side holder | Hangs a power supply on the side of a rack post instead of taking up rack space | Printed, fits well |
| NanoKVM holder | Mounts a NanoKVM remote console on a front post of the rack | In use |
| Power meter enclosure | Puts an energy meter and an ESP32 in a proper box, instead of a breadboard with mains wiring exposed | In use |
| Under-desk strip clips | Snap clips for a tapered Belkin power strip, on an openGrid panel under the desk | Printed; cable management under way, slowly |
| LED uplight troughs | Wall-mounted channels that tilt an LED strip up to bounce light off the ceiling | Printed, waiting to be installed |
| Ring prototypes | Helping a friend's daughter with her ring project | Second version printed well |
| Downtown LA model | A 3D model of part of downtown LA, just for fun | Printed |
| Laser drill jig | Lines up drill holes exactly on a laser level's line | First print taught me a lot; next version designed |

What went wrong
Plenty of first attempts didn't work. Each one taught me something I now do every time.
- Half a millimetre matters. My first test print of the power meter box had its mounting holes 0.5 mm too close together. The board didn't fit, and I only found out because I'd printed a small test piece first.
- Don't trust the listing. The LED channel I bought for the uplights is listed with different sizes depending on where you look. I measured it with calipers (17.1 mm wide) before designing the trough around it.
- Gravity still applies. The first kiosk display cradle had a floor floating in mid-air. The slicer printed it, badly. The fix was to carry the floor all the way down to the build plate.
- Small features vanish. The drill jig needs a narrow tunnel for the laser beam to pass through. At 1.5 mm, it printed closed. It's now 4 mm.
- Snap fits are hard. The first ring prototype's snap joints and tabs failed. The second version dropped them, and it printed well.
- PETG won't bridge over a cold magnet. I tried pausing a print, dropping in magnets and printing over them to seal them in. The plastic wouldn't stick across the cold magnet. In the end I went with open pockets and glue.
The biggest habit I've picked up is printing a fit coupon first. That's a small, fast test print of just the part that has to fit, whether it's a hole pattern, a slot or a clip. It costs a few minutes and a few grams of filament, instead of an hour and a full part.
How it's changed things
The biggest change isn't any one part. It's how I look at small annoyances. A device with nowhere to sit, a cable that keeps falling behind the desk, a bracket that costs too much: these used to go on a shopping list, or I just lived with them. Now I reach for the calipers.
The loop is simple: measure, model, print a test piece, adjust, print the real part. Because the models are code, "make it 2 mm deeper" is a one-line change, not a redraw. Most fixes go from idea to installed in a day or two.
I've also settled on one standard way of joining parts: M3 brass heat-set inserts pressed in with a soldering iron, and M3 socket-head screws. Every part I design now has the same 4.2 mm insert holes, so I keep one box of screws and one box of inserts, and everything fits.
It has spilled over to other people, too. I've been using the printer to help a friend's daughter with her ring project, printing prototypes she can actually hold and try on.
And my desk is slowly getting better. The power strip is off the floor and clipped under the desk, and the cables are following, one session at a time.
What's next
- Install the uplights. The troughs are printed. I just need an afternoon and a drill.
- Finish the cable management under and behind the desk.
- A corner cable duct system for running cables along walls and around corners, with 90 and 135 degree corner pieces and junctions. Designed, not printed yet.
- A rack shelf for bare mini PC boards, standing three boards on edge in one shelf. Designed; fit coupons come first.
- The next drill jig, with a deeper tunnel for the laser.
- A tray for a mini-ITX board and an RTX 3090, so my GPU server can live in the rack too. Still in the planning stage.
If you've been on the fence about a 3D printer, my advice is to buy one and print something small and useful in your first week. The first thing I printed that fixed a real problem is what got me hooked.